Whilst students were taking a well-deserved rest over the summer break, our Operations Team was hard at work, renovating much of the school campus. Classrooms were emptied, walls stripped bare, ready for repainting and refreshing.
On a larger scale, a permanent cover was installed over our outdoor basketball court, and tennis courts are in the process of being resurfaced into a multi-purpose athletic area (including tennis.) Pitches are being improved and aerated, and permanent shades have been installed over the outdoor swimming pool.
These upgrades will be a warm welcome for students when restrictions are lifted in Hanoi and students can return to campus, hopefully within the coming weeks!